EQuIS Collect – A Digital Solution for TC Energy’s Environmental Design Basis Workflow

TC Energy Corporation (formerly TransCanada Corporation) is committed to reducing its environmental footprint when developing and maintaining its pipeline projects. An extensive Pre-Construction assessment and Clean-up assessment process is used by TC Energy to protect sensitive habitat and wildlife and re-establish equivalent land capability after construction. An Environmental Design Basis (EDB) workflow allows staff and consultants to track the status of all Pre-Construction and Clean-up assessments. 

Working with EarthSoft, TC Energy evaluated a digital solution for their existing EDB workflow that incorporates EQuIS™ Collect software to enhance their field data capabilities. Read about their challenges, solutions, and successes.

Want to learn more about EQuIS?