TC Energy Corporation (formerly TransCanada Corporation) is committed to reducing its environmental footprint when developing and maintaining its pipeline projects. An extensive Pre-Construction assessment and Clean-up assessment process is used by TC Energy to protect sensitive habitat and wildlife and re-establish equivalent land capability after construction. An Environmental Design Basis (EDB) workflow allows staff and consultants to track the status of all Pre-Construction and Clean-up assessments.
Working with EarthSoft, TC Energy evaluated a digital solution for their existing EDB workflow that incorporates EQuIS™ Collect software to enhance their field data capabilities. Read about their challenges, solutions, and successes.